Explore railways.im

Useless’s field notes

Where the official figures sit side by side

This is the desk for the nuances. The story pages keep the same facts, in a warmer voice. Nothing here is invented, and nothing here is averaged.

125 and 126

Mallard 75 opening: raced down Stoke Bank at 126mph on 3 July 1938; “that record still stands.” Same page, later: 120 mph for five miles; claimed peak 125 mph before Essendine; subsequent examination suggested 126 mph, “for less than a mile,” which Gresley declined to mention; claimed 125 mph beat the May 1935 German steam record of 124.5 mph; plaque showing 126 mph fitted after the war; Duddington’s 1944 BBC recollection showed 126mph was “a well known claim at the time despite Gresley’s reluctance.” [source] Star-object page: “rocketed to 126mph in 1938, a steam speed record that was never surpassed.” [source] Archived fact sheet: “recorded travelling at 126 mph” on 3rd July 1938. [source] Science Museum Group copy, saved 16 November 2026 (live page 403 on 18 November): claimed 125mph, later re-appraisal showed 126mph “briefly.” The copy spells “initiially” in that sentence; the spelling is left as written when the line is quoted. [source] A precise figure on a photograph caption is not used.

Steam record, or overall record

Science Museum Group copy: record “only applies to steam locomotives”; overall railway-vehicle record a German experimental electric railcar, 130mph in 1903. [source] Mallard 75 does not, on the re-opened page, name 05 002; the Group copy does. 114 mph is the then British steam record held by the LMS, not a world record on this desk.

Gresley’s title

Mallard 75 body: “Chief Engineer at the LNER.” Same page caption: “Chief Mechanical Engineer of the London and North Eastern Railway.” Fact sheet and 2026 display: Chief Mechanical Engineer. Official spelling “preceeding” on the A3 comparison is left as written.

Weight and cost

Archived fact sheet, locomotive: 102 ton 19 cwt. Built 1938, Doncaster; cost £8,500. No kilogram figure is taken from a page that could not be re-opened this turn, and none is invented by conversion.

Headboards and captions

“The Coronation” in 2009 and 2010 photographs is not the 1938 record train. Photographer wording that places the record “at Essendine,” or that uses a more precise unofficial figure, is not used in place of museum wording.

The run, in official order

Gresley authorised a bid to beat the LMS’s then British steam record of 114 mph. He chose Joe Duddington and Thomas Bray. The rest of the crew were told at Wood Green. The attempt started at Barkston, so Mallard would descend Stoke Bank. The dynamometer car recorded 120 mph for five miles. A small window before Essendine produced a claimed 125 mph, and a later examination suggested 126 mph for less than a mile. Braking for the curves made the big-end bearing run hot, and the locomotive was taken off at Peterborough. The LNER still got the publicity. [source] A Science Museum Group copy also frames the morning as a series of brake tests, with the speed recorded on paper rolls, “at Stoke Bank, between Grantham and Peterborough.” [source]

The official almosts

Duddington believed the locomotive could reach 130 mph. It is believed Gresley planned another run in September 1939 to reach 130 mph, prevented by the Second World War. Those sentences, from the saved Science Museum Group copy, stay beside the 1903 electric 130 mph, not on top of it, and not in place of 125 or 126. [source]

Keep the lights on

Enjoyed this desk on 125, 126, and a steam record that still stands in its official category?

No pop-ups. No intrusive advertising. Just interesting stuff. A little support helps the next railways.im site get built.